Hello Guys
i have a setup with 6 multiplus 48/5000 (3 Phase, 2 in Parallel) to power a house with multiple households.
Now i would like to add a PV Inverter to the AC out and was wondering if i can use a external PLC to throttle the PV inverter rather than Frequency shift (or lets say using the frequency shift only as backup)
is there a Modbus Register in the CerboGX i can use as reference to know when it is time to throttle the inverter and to what power?
thank you