I'm currently sorting some issues on a previously installed system on a boat. The boat has both 110V and 230V.
There are 2 x 12/5000 120v Quattros in parallel on the 120V side, these are supplied by either shore power of through the generator on AC 1. Why the previous installer fitted Quattros and didn't bring the shore power in, I dont know.
There is 1 x 12/5000 230V Quattro on the 230V side, supplied only by 230V.
The system has a CCGX, Lynx BMS 3 x VE CAN Solar MPPTs and Victron batteries.
Only the 120V Quattros are connected to the CCGX and therefore managed by DVCC, the 230V Quattro is not.
Can the 230V Quattro be also placed on the VE Bus and be managed by DVCC and show as an AC input?
Same FW in all units.