Hi guys,

i was wondering if you could take a look and if you have tips i would like to hear it!

tnx in advance


artboard-1-100.jpg

system design
artboard-1-100.jpg (707.1 KiB)
3 comments
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

matt1309 avatar image matt1309 commented ·

Hi @MCWopperr

Just a heads up folk get a bit touchy about system design questions on here. But hopefully you'll get some responses.

If you take a very high level view of alternator via orion + solar + lifepo4 + multiplus then all is fine but think there might be a few things with the schematic that would need changing or at the very least are nice to haves.

This isn't a complete list ofc .

1. I dont work on vans so i might be miles off here but i dont think you can use van chassis the way you've shown in diagram. That's a lot of current being run via chasis... And i imagine the 12v starter battery side of system will be using chasis somewhere. So you'd be mixing 12v and 24v (lifepo4). Which seems like a bad idea (again not a van guy so maybe wrong just seems bad).

Always hate when folk say this to me but given the size (and cost) of all that equipment might be worth getting a spark to help with the diagram at the very least.

2. Add way more fuses/disconnects. I like to have each element of the system fused with it's own disconnect, so you can not only work on specific elements without shutting down entire system but also help diagnose any issues you run into.

I would have fuse between pretty much everything and the main buss bar. As well as one between PV and charge controller.

3. I'd probably add a smart shunt on things you want monitored in gx device. Someone correct me here but i didnt think orion could be monitored directly (unless newer models can). Similarly for the 12v loads if you want/need to monitor the loads add another shunt.



0 Likes 0 ·
Show more comments
3 Answers
regman54 avatar image
regman54 answered ·

Also, within the first paragraph of the Victron Community Guidelines section there is a link to their Support page where you can put questions to Victron directly.


Victron Community Guideline

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Justin Cook avatar image Justin Cook ♦♦ commented ·

Support Requests don't go to Victron, they just get sent randomly to distributors/dealers to try to answer. For system design questions, always best to consult an experienced installer directly.

0 Likes 0 ·
kevgermany avatar image
kevgermany answered ·

First thing that struck me is there's a direct short across the left lithium battery.


Unless misinderstood your diagram, both sides of it are connected through the green wires and the bridge between the batteries. Please get professional help.



1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

mcwopperr avatar image mcwopperr commented ·
i dont see it? the battery's are in serie
0 Likes 0 ·
Sarah avatar image
Sarah answered ·

Hi @MCWopperr as @matt1309 said you are on the right track. As you are using SmartLithium batteries your BMS need to be integrated more into the design. I would suggest splitting the charge, load and inverter circuits. On the charging circuit I would add a Smart Battery Protect (in lithium mode) and connect it to the Allowed to Charge (ATC) signal on the BMS. I would do the same on the Load side and connect it to the Allowed to Discharge (ATD) signal on the BMS. The battery protect can also be used to isolate the loads and charging circuits these also operate in one direction only so be careful with polarity. The inverter will be managed over the VE.Bus as per your design.

You could also wire the ATC signal directly to the charging Orion and mppt and the ATD to the 12/24 v Orion.

I hope this helps.