Hello!
I operate a three-phase ESS consisting of three MultiPlus 3000, three Vitron MPPT charge controllers with approx. 7 kWP solar modules and a Pylontech 14 kW storage unit.
The EV charging station is integrated and PV surplus charging works perfectly.
Now I have also installed an AC-Thor with a 3 KW heating element in the house network (i.e. on the AC-in side of the Multiplus, NOT on the AC-out). The connection to the Cerbo GX is established and works. How can I let the two devices use the PV surplus so that, for example, when the electric car is connected, it uses the surplus primarily before the AC Thor (or vice versa if necessary)?
Unfortunately I can't find any information about this.
Thank you for any help!