Since January the VM-3P75CT acted as "AC load", no apparent issue.
Installation overview:
- 3 MultiPlus 5kVA for a 3-phase installation, ESS, firmware v506
- VM-3P75CT firmware v1.05, communication under Modbus TCP/IP
- 2 MPPT 450/100 + BYD
We've just move it as "Grid meter" to be able to do self-consummation for a agricultural workshop (with heavy loads such as welding) and here is the problem:
- With or without charge, the values are inconsistent with a huge standard deviation on each phase => no way to discharge the batteries => SOC at 100%
- The VM-3P75CT is not seen on Remote Console / Setting / Energy meters but seen Remote Console / Setting / Modbus / devices
Is there a way to read the VM-3P75CT log to be able to see if there is some communication errors?