Hi all,
My basic ESS will be:
- Grid
- Energymeter ET112 on grid
- All loads connected to grid
- Multiplus II 48/3000 + Cerbo GX- AC-in connected to grid
- PV system (Hoymiles micro-inverters)
- connected to MPII AC-out 1 or 2 (obeying to factor 1.0 rule)
- Battery Pylontech, 1x US5000 or 2 US3000C
Question:
- With the grid-meter set to "0" and a heavy load is turned on, even above the 2400W, will the power first come the grid and with some lag the inverter will ramp up to the requested power/max?
- Will the "ESS limit inverter power" to 2000W be an option to prevent the inverter stress to the max?