Hello,
i have a private ESS Setup (3x MP2 8kVA, Cerbo GX) together with some Pylontec US3000C. Everything works perfectly fine!
At work we have a smaller server room which needs new UPS. The total needed power amount is roughly 2x 1 kW (every equipment and server has 2 power supplies). Currently it is solved over multiple smaller UPS. The shutdown procedure and power survaillance is already idependant of the UPS. So the only need to provide power. The idea is now to build up a victron system: 2x MP2 3kVA, Cerbo GX, 2x Pylontec US3000C. This should increase the time significant, and it should reduce the amount of batterie changes.
Basically I would start to build a connected MP2-System with 2 (of 3) phases and the Cerbo GX to connect the BMS and the MP2-System. But since I don’t have experience with Backup-UPS setup of Victron, there are some questions coming up: The system should be as reliable as possible. So when one component fails, at least one MP2 should still provide power. Is this in connected mode the case, when one MP2 fails or are both shutting down? I also have read in the community, that may the switch-over time is faster in single mode. So since there is no technical need for me to have the MP2 connected in a system: Can a Cerbo also run with two individual MP2 in 1-phase mode? What happens when the Cerbo fails? Are the MP2 running in “fallback” mode without the Cerbo? Or do I better have to setup a complete redundant setup: 2x (1x MP2, 1x US 3000C, 1x Cerbo)?
Thank you and best,
Johannes