I would greatly appreciate any suggestions regarding a replacement fusebox given the wires have outgrown the current solution (see below).
For example, a more permanent box / busbars with possibly trip switches instead of fuses either from Victron or alternative.
On the left:
16 mm2  from MPPT connecting to 60 A midi fuse
50 mm2  to inverter connecting to 200 A mega fuse
On the right:
2 x 35mm2  to batteries
1 x small cable to BMV 712 Smart
Best regards
