dbus-driver: Expected value L1,L2,L3 Energy

Hello

I am writing my own dbus-driver for reading my P1 smartmeter and I was wondering what values does Victron expect here:

schermafbeelding-2023-12-05-092449.png

schermafbeelding-2023-12-05-093338.png

For now I send the total imported per phase

Could someone post some screenshots from their energy meters or explain what values to expect here?

Totals per phase or energy per phase per day?

cerbo gxEnergy MeterModbus TCPdriver
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

3 Answers
dutchsolarfreak avatar image
dutchsolarfreak answered ·

Hello

Could someone post some GUI screenshots from their (3 phase) Victron energy grid meters?

I would like to know what is presented in the Energy L1..L3 fields.

Is this Energy per phase/day or Energy per phase/total

Thanks

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Mr.Orange avatar image
Mr.Orange answered ·

This is from the new Victron Energy Meter VM-3P75CT:

1703198708096.png 1703198742467.png


1703198708096.png (18.2 KiB)
1703198742467.png (14.8 KiB)
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Mr.Orange avatar image
Mr.Orange answered ·

Carlo Gavazzi EM530 Via RS485 USB adapter. 1703198843851.png1703198862303.png


1703198843851.png (17.0 KiB)
1703198862303.png (16.0 KiB)
2 |3000