Hi Margreet,
Thank you for this excellent resource. An essential reference for anyone planning a renewable energy system.
I noticed in Section 3.3 Parallel Battery Wiring, page 19, the diagrams of "correct" parallel wiring, appear not to be the best option.
IOTA Engineering published an article on the subject of balanced charging. https://www.iotaengineering.com/pplib/balancedcharging.pdf
Here is an excerpt;
Also of note, with regard to the installation of an RCD(s) within a system. No mention is made of the NEC Code requirement that an RCD must be installed between a PV array and the MPPT.
This information should be included within 4.10 Solar panels and page 56, Where to mount a RCD.
Also, on page 61, the statement;
Isolation of MPPT solar chargers
No isolation between PV input and DC output
Basic isolation between input/output and chassis.
This statement is rather brief and unclear to me. Can you elaborate?
Best regards,
Glenn