Hello, perhaps someone can help me with a short answer.
I currently have a 3-phase system with 3 x 5kVA Multiplus II, a SmartSolar MPPT RS 450/200 and a 28.6 kWh battery. And a Fronius AC inverter behind the Multiplus system.
Now I would like to expand my battery capacity, but I have no more space for additional batteries where the Victrons are installed. So I was thinking of installing three new Multiplus II in a different location and connecting the new battery pack there. Would this work? What would the control system look like? Would I need another Cerbo GX?
At the new location is only power with 3 phases and a maximum of 1 dedicated LAN connection via which other signals can be sent.
Many thanks for your answers.