I have the following set-up (extract):
1 CERBO GX
1 Multiplus II 3000 48
48V Battery (3x 3,5kWh Pylontec)
and now 3 MPPT with 1kW, 2kW and yet extra 2kW solar power peak.
As the mutliplus can roughly transport 2kVA to the grid, the CERBO needs to "eliminate" the extra power by reducing the power on the MPPT's.
Now in the worst case:
- Battery 100% loaded
- Changing from cloudy to full sun and the 3 MPPT can generate 5 kW @jump responce of power increase
Now my question:
- Can the CERBO + Battery (BMS) + MP II can handle the 5kW ?
- Up to which "power rate" does the System can handle this without harming the battery (overvoltage?) or other parts ? Were is the limit on the DC solar power reached?
In mechanics we talk about "moment/inertia ratio" for a perfect system, how is it defined here @Virctron solar power on the DC side?
Thanks a lot