I have a 15kva Quattro with Solar, Batteries and a Generator.
It’s , set up to start the Generator at 6 kva.
I also have a decent 4kWp of solar connected to the system.
If it is super sunny and gaining 3kWp and the base load is 6kVa, I want the system to Use Solar + Batteries until 8-9 kva, and then the Generator....
How do I prioritise this?