question

Patrick avatar image
Patrick asked

Is there a way to test the allow-to-charge (ATC) and allow-to-discharge (ATD) manually?

I'd like to be able to trigger the ATC\ATD on\off signally to test my installation? Is there a way to do this?

ty!

lynx bms
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
klim8skeptic avatar image
klim8skeptic answered ·

@Patrick Sure, you can disconnect 1 of the BTV cables from the BMS to simulate a problem with the batteries balance, temperature or voltage.

2 comments
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Patrick avatar image Patrick commented ·

Thanks for the reply @klim8skeptic.
What do you mean by BTV?

0 Likes 0 ·
Show more comments

Related Resources