I've 2x quattroes 8K in parallel configuration (by setting, not wiring)
AC IN/OUT of them are connected/disconnected by contactors following OFF-GRID scenario.
1. when AC OUT => no AC IN from GRID (AC OUT is powering house, taking energy from batteries and FVE panels, AC OUT from both are joined to 1P after 3P contactor - since there are 2, only L1 and L2 is used - its like quattroes => 3P contactor => joined L1, L2, L3)
2. when AC IN from GRID => no AC OUT (just for charging the batteries, 3P contactor is open on AC OUTs)
PLC is driving the contactors and there are mechanical, electrical and software interlocks so they cannot be closed both at same time.
the question: when operating in (2) mode, can I power one quattro from L1 and second from L2 so i can charge the batteries faster and splitting the load into two phases will be also better, since I have 3P GRID and "only" 3x 25A ?