lalluyn asked

Use Node-red to control MPII

Hello,

Is there a way to force MPII 5000 to use Grid if AC Load is > 2500W for exemple ?

or to force MPII 5000 to use only solar power or grid power from 8.00 am to 5.00 PM ?

ESSNode-RED
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

2 Answers
nickdb avatar image
nickdb answered ·

You can do a lot of that with ESS natively by using the max inverter power setting, or schedules/peak shaving.

Most can also be managed via node red as well.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

lalluyn avatar image
lalluyn answered ·

Ok ....... can you say me anymore ?