Hi
This question might be a bit stupid, but I want to avoid issues.
I got my new MPPT RS 450/200 now, and I am asking myself if it needs to be configured before connecting it to the existing system (3ph Quattro, 8xUS2000C) or if the CAN connection to the CerboGX takes care about basic setting for the busbar/battery side? I assume solar can be configured than over the Cerbo somehow without need to pull the CAN and go with MK3 to the MPPT.
The manual I got is a bit vague on how to bring the MPPT RS into a running existing system.
Thanks in advance