Good day, we've installed 2 Multiplus-ii Victron inverters. Our system is running great, as long as we don't use grid power. The meter trips when we're connected to municipality power. The municipality won't aid us in getting the Disable line reversal token from Conlog so we don't have this problem anymore. Any advice please. Our installer changed settings and it still happens.

2 Multiplus-ii Inverters, grid tie limiter and cerbo gx

multiplus in parallel
6 comments
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Alexandra avatar image Alexandra ♦ commented ·

@rinelda

What is a grid limiter? What PV do you have? Ac or DC?


It seems to be an issue with the conlogs being overly sensitive to a bit of feedback which can happen at times.

Second question is it related to battery percentage? Or does it happen more when the battery is full?

You way around may be to AC ignore during the day.

1 Like 1 ·
Show more comments
nickdb avatar image nickdb ♦♦ commented ·
I'm not aware of any tweaking, even with a high grid setpoint, that will prevent this from happening with conlog meters and ESS. Only solution is to tweak the meter or try get it replaced.