I have an installation with a Quattro 48/5000 120V and want to add a programmable relay that turn on an LED alarm when overload pre-alarm to ultimately turn off the inverter through an external PLC. However, I am not sure how long I should put the delay. as I don´t know when exactly an overload pre-alarm is triggered. Anyone knows this?