My original system consisted of 2 solar arrays connected to 2 X MPPT 150/70 (Ve Can) each solar array consists of 15 X 275W panels.
The MPPT 's are connected by (Ve Can) to a Cerbo GX.
I have added 2 X 3 570W panels connecting to MPPT 250/60 (Ve direct) connecting to the existing Cerbo GX.
The 2X MPPT 150/70 (Ve Can) are synchronised (they change state at same time) but the newly added MPPT 250/60 (Ve direct) is not synchronised with the other two MPPT's when it reaches absorption it then reaches float much faster than the VE Can MPPT's.
What can I do correct it.