Hello,
I am trying to find info about Quattro 48/15000 transfer switching time (specifically when the UPS feature is OFF):
- What is the switching time when switching from Generator to inverter and when switching from inverter to generator?
- Is the switching different in a 3-phase connection? and in a parallel connection (2 Quattros/phase)?
- is the switch time affected by load, temperature, or any other determinant?