I have a grid tied system (Multipluss II, CerboGX, SmartSolar MPPT regulating 4 x 450 W PVs and Pylontech US3000C batteries), that is running with Virtual Switch enabled and Grid Ignore while SOC is > 62 % and load is < 2 KW. All items are inter-connected. There are times when it is required to force the system to recharge the batteries to Bulk manually (i.e. not wait for a battery or load condition). This is due to being connected to an unreliable grid which can shut down at any time for extended periods. Question: Is it possible to force a re-charge from grid session via the Remote Console or the VRM app?