Hi everyone,
I'm in the process of installing an 8kw system, I have my DNO permission, max export 5kw, which is fine as I don't really want to export.
I'm almost done on install, can someone point me in the right direction to download a commissioning form? One to send to DNO
Many thanks
Andy