Hi, I'm looking for some advice.
The following system is managed by the Pylontech BMS.
48V 3000W MultiplusII, Smartsolar 150/35, Cerbo GX, 2 x Pylontech US3000C.
I can confirm DVCC is turned ON.
I was told I should manually set the pylontech recommended parameters in the multi and charge controller in the event they lose communication with the Cerbo. Do I turn OFF DVCC, set the parameters and then turn it ON for the BMS to takeover?