Is there possibility to enable L2 while inverting? I've read documentation and it states that L2 line is only enabled when onshore power is present.
I apologize, I am newbie. I have large bank and I want utilize both L1 and L2.
I assume there must be a configuration setting in VEConfig app.
Thanks