In case of AC load and while the generator is running the PV power is not re-directed to cover the AC load, thereby taking off the load from the generator. The MPPT continues charging the battery while AC load should be covered first (see the screenshot below).
I am kindly looking for advice if the system can be reconfigured to address such situations.
Main equipment:
Isolated SmartSolar charge controller MPPT RS 450/100 - Tr
Inverter Quattro 48V/5000VA/70AMP
AGM deep cycle 12V 240Ah x 8