My setup is all Victron with a Lynx BMS, Cerbo GX and Victron solar controllers connected to the GX. I want the solar to be maximized and shore power only used in certain conditions.
I found someone who set up ESS to do this, but have been advised here not to use ESS.
Other answers say to set the charging voltage slightly lower on the Multiplus.
But my understanding is that the BMS is setting the target voltages that both the Multiplus and MPPT controllers are using.
maybe there’s a way to limit charging on the Multiplus to inly happen below a specific SOC? Or during specufic time periods?