I have a complete victron system with stacked multiplus inverter/chargers, dual solar charge controllers, and a BMV on a boat.
When the grid input to the multiplus units is present for example the 90% of the time that I am connected to shore power, the multiplus units connect the incoming AC to the load side.
The result is that any AC loads are supplied from the grid and do not benefit from my solar installation.
I want to eliminate that. Right now when I am on the boat, in the morning I just trip the breakers that feed shore power to the multiplus units and then reset them in the evening when solar power goes away. This maximizes my solar production.
How can I automate that process?