Hi everyone looking at the DNO application its a mini mind field, So I've looked at the DNO application and G99 is <16amps per phase the multiplus 48/5000 is rated at 19Amps so surely you couldn't have this on a G99 app? and the G100 has the import limit bear in mind that the 48/5000 has a hardware limit of 50amps draw max pass through so the only factors that would see the import rise is the non critical loads on AC side.
I have existing solar on a G98 the array is 3.21kW with and inverter of just 3kW i'm not planning on exporting anything other than surplus from the PV array. I'm looking at getting 2x 5kW batteries as far as i can see the total sum of the install is taken into account to decide what application to go for. And here lays the other problem it doesn't seem like any of the vitreous are tested to G100 or put differently certified for G100. I'm aware that the 48/5000 isn't certified yet. Anyone give me a bit of help on this as even for the G99 looks like the DNO still wants an export limitation scheme "Does or will the premise have a single G100 export limitation scheme?"
Everything would be aggregated to the 48/5000 in regards to generation and export and everything bar washing machine and dryer coming off of the critical load side. Little bit of help re this would be most appriciated.