3 Phase system
CCGX
2 x SmartSolar MPPT VE Can 250/100
3 x Quattro 48/5000/70 2x100
30kVa Generator
My question is this, if I disconnect the CCGX and connect the mk3 interface then saved the settings in Victron Connect, after the upgrade and I load the settings again via Victron Connect would all the settings be reinstalled or would I need to use VEConfigure to set it up as a 3 Phase system again?
Excuse the dumb questions its just that I am in Mozambique and the installer is working out of country at the moment and I am having issues when the generator starts automatically, the one inverter is picking up the incoming voltage as over 250V even though tested at the inverter as 231V.
I want to do a firmware upgrade to see if this fixes the issue.