Hi everybody,
I'm working on an installation with 3 BlueSolar MPPT charger an 2 parallelized Multiplus II inverters.
I whould like to know the best practice to connect au safety switch to shutdown all the devices on one shot.
Can I simply parallelize a NC safety switch on all "remote on/off" connectors of the devices?
Thanks