I am planning out an installation of solar for a building that will be largely unmanned. One thing that I want to do is install some redundant components so that the solar will keep function in the event of one failure, until someone can get there to perform a fix.
Has anyone setup a Quattro 48/5000 and solar MPPT with a spare such that both are functioning to provide a total of 5KW output load? I think the Quattros can be controlled with a Cerbo to do this, but not sure on the best way to set the MPPTs.