- I had a single multi system working fine connected to my 20kwhs of PylonTech batteries. There wasn’t enough off peak grid available to recharge them from 10% to 100% over night (4hours) so I’ve installed a second Multi. I had multiple error messages last night as I tried to get everything to talk to each other and eventually managed to get it to schedule charge at 00:30. It drew 140amps which put one of my cables up to 102°c so I knocked the input ac amps back to 30amps and this reduced the DC amps to 100amps and the cable temp went down to 60°c, there was no fire risk but do need to look at the connections and / or cable size (25mm). The system recharged the batteries to 100% last night and started up this morning but the returned a #3 error, not all devices… found in the system.…and the. A low battery alarm.The system is saying the multi is not connected.
I’ve done a hard reset on the system, even powering down the batteries and it started up with the Master showing the inverting led and the slave flashing the two lights which I presume means it’s working in slave mode but with no output to the AC out 1 which my heat pump is connected onto. - I have read and watched the advanced videos on parallel systems and I did set up the master and slave via VEBus quick setup although I presumed there was only a need for one ESS assistant on the master.
- Any help would be appreciate, thanks.