Hi Community,
I am designing a three phase 400VAC off-grid system with custom designed battery pack, PV and Wind.
Could you please help me with the questions I have?
Below are the details of the system.
Battery pack:
custom made Li-ion NCA, 75kWh, 10x 12s53p modules, 43.2V nominal voltage, LiBalance n-BMS
PV setup:
20.8kWp, 64 Heckert SolarNemo 2.0 60M 325Wp panels, 40.94Voc per panel, 16 strings with 4 panels in series, 4 Victron Smart Solar MPPT 250/85 - MC4 VE.Can
Wind setup:
BWind 6kW wind turbine, Kostal Piko 4.2 & Kostal Piko 2.5 single phase inverters
Loads:
single phase loads distributed between three phases, max 15kWp load
Questions:
Will the already installed MPPT chargers be able to properly charge the battery pack (voltage and power)?
Will the Victron GX be able to communicate with the LiBalance n-BMS?
Is there communication needed between the BMS and Victron GX?
What Victron inverters should be used for creating the three phase system?
Thank you in advance.