Current Transformer for MultiPlus-II VRM View

Hi

Is it possible to see the non-essential loads and essential loads in the VRM portal lay-out?

See pic of ET112 install and Current Transformer.

With ET112 I can see the non-essential loads.

1671285383308.png

ET112

1671285408009.png

Current Transformer

Am I doing something wrong?

Thanks Hugo

power meter
1671285383308.png (37.4 KiB)
1671285408009.png (30.6 KiB)
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
wkirby avatar image
wkirby answered ·

Using an ET112 adds an additional sensor in the system, ET112 and internal CT, so you get an additional measurement box for critical loads.

When using the external CT, it disables the internal CT, so you are not adding any more sensors, just moving the internal one to external in effect. So that is why no additional measurements are presented.