The Multiplus 3kva spec sheet states 2400w at 25deg C and 2200w at 40deg C. Does the derating start at 40? or is it a linear progression starting at 26 and up?
I have sensitive equipment that will need 2700va of power at its max (but much lower continuous) and need to correctly plan if the Multiplus 3kVa is suitable.