Hi all,
Cerbo GX with ESS with DVCC
MultiPlus ii
SmartShunt
2x MPPT 100/30
24V battery bank (8x 6V FLA in series/parallel)
I have a 500W turbine which I want to integrate into the Victron system. This currently has a simple 24V controller. How should I go about safely integrating this with the existing system? Do I need to make any special considerations or can I just connect the controller output to the battery bank?
Many thanks.