We have a multiplus 2 48v 3000va and a Pylon Us5000 4.8kwh battery kit with Cerbo GX kit for an ESS to our existing 10 year old system with 2.25kw of solar via a SMA sun boy inverter.
Please can anyone point me in the direction of the simplest ESS setup diagram so that the installation does not effect our UK feed in tariff?
I understand the Multiplus 2 AC in connection is bidirectional so is this the only power connection needed other than the 48v battery connections?
In addition to the above, is there a maximum distance we should be considering for the position of the Pylon battery from the Multiplus? Cables in the kit are 2m.
Many thanks for your help in advance.
Andrew (Bristol)