The system: 2 x 5kva multiplus 2 in parallel, 1 e112 meter 1 450/100 rs
The only load on the grid side is the geyser. When it comes on the system always feeds around 450w to 500w to the grid. All meter wiring double checked. Why would this be? Feedin excess is off and grid setpoint is 0.