Programming Victron Quattro 10 KVA with priority to load as Solar, Grid then Battery.

vs1.pngvs2.pngvs3.png

We have one issue in one of our clients project name 'Sher Singh Nagarkot' at VRM portal.

The system includes:

1. PV : 5.94 KWp

2. Inverter: Victron Quattro 10KVA

3. CC: Blue MPPT 150/70

4. Battery: 400Ah Tubular

Right now the load is around 3.3 KW, Solar Power is fluctuating from 2500-4500W. It is installed in hilly area.

When solar power is low, both solar and battery contribute to load and hence battery voltage drops to 49V and which triggers to take AC input, which will charge the battery to 56V till 3mins then AC input is cut off, then again solar power and battery contribute the load.

In night time, battery only contribute to load, battery voltage goes to 49V then AC input is taken which will contribute to load and charge the battery to 56V then AC input gets cut off, again the battery contribute to load and the cycle goes on.

At the end the battery is getting charged and discharged that depletes the battery life.

What we want is to not use battery at all and use it for backup when there is no Solar or Grid. What do you recommend?

victron community
vs1.png (38.8 KiB)
vs2.png (38.2 KiB)
vs3.png (30.2 KiB)
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
nickdb avatar image
nickdb answered ·

This should be posted in the Q&A forum rather, you need to load the ESS assistant and then use the keep batteries charged option.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.