I have a Multiplus 2 (Single phase ESS in a three-phase system).
And a Fronius Symo 3 phase Inverter (3kw).
And 1 Phase DC MPPT (1kw)
It’s running really great.
Is there an easy way to change the behavior of the ESS. I think Mode 3 with node red will work, but is very difficult to configure.
I like to have a max of 3kw to Grid at day (Total of all phases is a good option) with AC and DC-coupled PV - feed in excess
And at night there should not be any feed in to Grid. (Individual phase option works)
Thanks, Markus