Hi to everybody!
I would like to create a 2 Phase system. One Muliplus 3000 that can also feed into the grid (my power company did not accept my request to use the 5000 even though the may power could be limited.)
And one 5000 that is connected to the grid, but will not feed any engergy back. (needed for heavy load (aircons and heatpump) Also i would like to combine two phases to this MPII because i dont need a true 3P System and i could cut one MPII out of the bill.
Is this possible?
Sincerely
Adam J.