Can someone tell me why I have 2 icom on the Input side of the inverter icom I have the grid connected as shown by the red icom but why have I the other green AC loads box marked with the black X can this screen be edited if the icom is not required ? My house is ll connected to the critical loads on the outside of the Quattro.
I cant understand why this green AC loads box indicates ?