We have an setup with an Multiplus 48|1200|13 inverter and the Cerbero GX to monitor the system via Modbus.
At this system we installed a 3-Way switch at the Multiplus inverter to remote control
"inverter-off-charge only" functionality to the shown terminal.
To do this we read here that you must set DIP switch 1 to on.
This works, but after a few minutes the system switches off and then on again.
At first, we thought this was a problem with the switch, but it also happens when I connect the contracts directly.
Do you have any idea where the problem could be coming from?
Thanks for your support
Wolfgang