I'm planning to install a new system with a multiplus-II 5000 but I think that power will be not enough within some time (in a 2 years time frame). I'm planning to pass to a parallel configuration in two years. I will be able to add additional PV modules and batteries (Pylontech) and use more power and also to have a level of redundancy
Considering that is possible to have only a GX device what do you think is the better option:
1. Install now a multiplus-II GX now and then install a second multiplus-II GX, disabling the GX part
2. Install now a Multiplus-II and a Cerbu GX and the install another Multiplus-II
3. Install now a Multiplus-II GX and then, in parallel a Multiplus-II NO-GX
4. Redundancy is not required, use a Multiplus 8k or 10k now and a Cerbu GX and upgrade only batteries and PV modules
Thanks!
Kind Regards!
Danilo