I have set up a 2 phase system with 2 Quattros, only to find that the aes does not work. Looking a little deeper I find that AES settings will be ignored when the device is part of a VE.Bus system.
How can I get AES to work while being a part of a VE.Bus system as the amount of energy consumed is so great being 120 watts per inverter thats a total of 240 watts while they are doing nothing thats 5760 watts a day that I was unaware of due to the misleading information on the technical specifications data sheet which states 55 watts which in my case should be 110 watts.
At the moment the stand by draw is so great and so out of misleading specifications that it is not really acceptable. I also do not see anything on the data sheet that AES will not work as part of VE.Bus system which is needed for multi phase or parallel set up. I also expected to be able to use this function with my 2 phase set up.