I am planning an off-grid installation where i would like to have separated output lines for critical loads (lights, refrigerator, etc) and non-critical loads (water pump, Water heater, etc).
I would like that inverter only enables non-critical loads when there is enough solar pv production and batteries are full or reached some charge level
Is this possible?
If so, what VE equipment do i need?
Thanks