Hi everyone,
I just installed for the first time the Cerbo GX with mi Multiplus 48 3000 35, MPPT 150 -35 and pylontech 3,5kwh. ( I can't connect the MPPT yet as I am missing the VEdirect cable but I should have it soon. I connected the inverter to the left VE Bus port and the pylontech to the left BMS-Can port of the Cerbo and to the A-Can port of the battery and the blue terminator plug in the other BMS-Can port ).
I had to connect to the VRM portal as it seems the only way to be able to see the battery charge but to my surprise it says 78% charge although all 6 leds on the pylontech battery are on and the BMV700 it says 100%.
What is wrong here? Thank you