Just a cosmetic problem.
In the Cerbo GX the PV-inverters connected to phase L2 and L3 are displayed as L1.
this gives a wrong calculation of the AC Loads.
PV-Zuid is connected to L3.
Is there a solution to tell the Cerbo GX that the ET112 is connected to an other phase than L1?
Thanks,
Ted