Hi,
I'm looking to purchase a Multiplus II - GX, 5000, which I would plan to use with 2 banks of 2 Pylontech 3000C batteries. I would like to know about the supply RCD:
I see in the installation manual, it says that the MP2-GX should be installed with a 32A RCD. But, my specification for the 5000 is based on the switching capacity, so I can supply up-to 50A downstream during normal operation (when the grid is up). Shouldn't it be installed with a 50A RCD (and the manual just relates to the 3000 version)?
Thanks in advance,
Glyn